ElectroFleet
Language:DEENNL
Language & region

Available

More languages — in preparation

DE · EN · NL are fully available. Further languages follow with the rollout.

hero
[IMAGE] Osnabrück charging hub: current construction progress (aerial view of the site) next to the 3D visualisation of the finished charging park

References

From practice, not from the brochure.

How logistics companies electrify with ElectroFleet — setup, figures, experiences.

customer_stories

Case studies

Our first own charging hub is being built in Osnabrück. Until the first customer projects are running, we show the real state of play: construction progress, planning and a visualisation of the finished charging park.

Regional transport

Depot electrification without CapEx

Setup: depot charging per kWh · Fleet: [X] e-trucks · Result: predictable charging windows, Δ €/km confirmed.

[IMAGE] Depot with charge points in operation
Download case study

Long haul

Charging on the road at a charging park

Setup: Charge on Route · Use along the corridor · Result: no land of your own needed.

[IMAGE] Shared hub on a highway corridor
Download case study

Tender

Green corridor won

Setup: Charge on Route with CO₂ proof · Result: tender with an ESG criterion won.

[IMAGE] Loading / green corridor
Download case study
testimonial
[IMAGE] Portrait of a fleet manager / managing director of a reference customer

[Name], [Rolle], [Referenzkunde] — Platzhalter

“The vehicles are here — and charging operations work in practice, not just in theory. Construction, grid connection and operation are with ElectroFleet; we look after vehicle and driver.”

Discuss your project
cta_row

Want figures for your own case?

Calculate your entry or get the documents for your buying center.