In 2 minutes, no obligation

Is your land a fit?

A few key figures are enough for a first assessment — traffic light A/B/C.

site_map

Faster: mark it on the map

Drop a point on your plot and drag out the area — from that we estimate size, corridor proximity and PV nearby. No typing needed; the detailed form is below.

Motorway A1Hub OsnabrückPV
Click and drag to mark your plot

First assessment

No plot marked yet.

A rough estimate from the schematic demo map — the exact check we do after you submit.

Submit this plot
site_check

Your key figures

Location / nearest highway or corridor
Plot size (approx. m², guide value from 2,000)
Layout: drive-through for articulated trucks? Yes / No
Grid connection: existing / applied for / not yet enquired
Connection capacity (if known)
PV on the land or within approx. 1 km?
Ownership/lease status
Assess suitability

Result (example)

First assessment — no obligation

Traffic light: A / B / C

A = close to a highway/corridor, strong grid connection, good permitting prospects.
C = remote or grid-weak.
We carry out the exact assessment after your submission.

Submit your land
criteria

What matters

Proximity to a corridor

A motorway, logistics axis, depot or port nearby — guide value: no more than about 20 km.

Land & layout

Room for drive-through truck charging bays — guide value: from around 2,000 m².

Grid connection

Capacity, lead time and cost realistic — and whether an application is already running.

PV nearby

Photovoltaics on the land or within about one kilometre — it makes the site self-sufficient and cheap.

Permitting prospects

Zoning plan and local acceptance.